Excellence in Design for Greater Efficiencies (EDGE Expert) Exam Questions and Answers

Question 1

Which of the following building types is NOT covered by EDGE?

Options:

A.

Hospitals

B.

Schools

C.

Factories (heavy industry)

D.

Warehouses

Question 2

Who are licensed to train candidates as EDGE Experts and EDGE Auditors?

Options:

A.

EDGE Faculty

B.

EDGE Auditors

C.

EDGE Certification Providers

D.

Accredited EDGE Experts

Question 3

In EDGE software, occupancy sensors are used for controlling:

Options:

A.

Lighting.

B.

Water taps.

C.

Air conditioners.

D.

External lighting.

Question 4

A hotel developer is planning a project. The specifications are based on corporate design standards for water fittings, lighting, heating, and air-conditioning. The EDGE Base Case will:

Options:

A.

Not be suitable for certification of this project.

B.

Be adapted to accommodate corporate specifications.

C.

Use the local typical building practices or code.

D.

Be verified on a case-by-case basis for the hotel chain.

Question 5

Which of the following can deliver the highest efficiency in fans and pumps?

Options:

A.

Two speed drive

B.

Single speed drive

C.

Constant speed drive

D.

Variable speed drive

Question 6

What will reduce the hot water demand in a hotel building?

Options:

A.

Solar photovoltaics (PVs)

B.

Solar water heating

C.

Low-flow shower heads

D.

Heat pumps for hot water

Question 7

A building is located in a hot and dry climate where water availability (rainfall) is low. Which of the following measures will give the lowest water savings?

Options:

A.

Low-flow showers

B.

Rainwater harvesting

C.

Recycle black water

D.

Dual flush for water closets

Question 8

Which of the following does NOT contribute to an EDGE Auditor maintaining their Auditor status?

Options:

A.

Performing at least one project site audit every two years.

B.

Studying the EDGE user guides as and when they are updated.

C.

Retaking the auditor exam.

D.

Attending refresher training.

Question 9

Which of the following measures provides the most attractive solution in the EDGE software for a hospital?

Options:

A.

External shading with 7% saving and 8 years payback

B.

Insulation of external walls with 3% saving and 9 years payback

C.

Solar hot water system with a saving of 15% and payback of 6 years

D.

Water-cooled chillers with 20% energy saving and 10 years payback

Question 10

A potential EDGE Client is pursuing EDGE Zero Carbon certification for a museum. Which of the following statements is correct?

Options:

A.

The project team can select any typology they consider applicable.

B.

The building must be operating for at least 6 months at 75% occupancy.

C.

The project cannot be certified because EDGE does not have a ‘museum’ typology.

D.

The building must be operating for at least 12 months at 75% occupancy.

Question 11

Which of the following may NOT lead to a higher adoption of green building practices?

Options:

A.

Green building regulations

B.

Lower electricity supply costs

C.

Public awareness and capacity building

D.

Clear visibility of estimated savings and cost of green measures

Question 12

Variable speed drives in HVAC systems help:

Options:

A.

Reduce the speed.

B.

Increase the speed.

C.

Reduce energy consumption.

D.

Reduce water consumption.

Question 13

Which of the following describes a more efficient lamp?

Options:

A.

More lumens/watt

B.

Lower watts/m²

C.

Longer life

D.

Lower wattage

Question 14

As an EDGE Auditor, one requires a full set of documentation to support each green building measure selected in a project assessment. Providing this information is the responsibility of:

Options:

A.

The Client.

B.

The Facility Manager.

C.

The Building Inspector.

D.

The project design team.

Question 15

Which of the following is a required measure?

Options:

A.

Green roof

B.

Insulation of roof

C.

Lighting controls

D.

Efficient lighting for internal areas

Question 16

Which of the following is NOT a characteristic of the EDGE standard?

Options:

A.

Fast tool with ideal measures for the best return on investment

B.

Holistic approach that takes into account wider sustainability issues

C.

Smart, as capital costs and payback period for buildings are displayed

D.

Simple, as beneath the intuitive interface is a powerful engine that understands local climate and how buildings will be used

Question 17

Which of the following BEST describes an EDGE Expert?

Options:

A.

A consultant who can issue a preliminary EDGE certificate

B.

An individual accredited by the EDGE Certifier who can serve as a consultant

C.

An individual who can serve as both an auditor and a consultant upon EDGE Committee approval

D.

An individual accredited by the EDGE Operations and Management Team who can serve as a consultant

Question 18

Energy consumption calculations in EDGE are based on:

Options:

A.

Hourly simulation.

B.

Steady state calculations.

C.

Quasi-steady state calculations.

D.

Cooling and heating degree days.

Question 19

Which of the following parameters can be found in the EDGE App Results Bar?

Options:

A.

Building type

B.

Occupant use

C.

Incremental cost

D.

Climate conditions

Question 20

EDGE was created for new buildings to promote:

Options:

A.

Revenue for green building champions.

B.

Few exemplary high-performance buildings.

C.

Simple and scalable platform for green buildings.

D.

Highly accurate prediction of resource consumption.

Question 21

In the EDGE certification system, who is responsible for the entire project including providing project documentation, access to the site, and the payment of audit and certification fees?

Options:

A.

EDGE Expert

B.

EDGE Auditor

C.

Project Owner

D.

EDGE Certification Provider

Question 22

Which of the following protocols should be followed when the project city is not listed in the EDGE App?

Options:

A.

Write to EDGE Certifier to request the city to be included and wait for the application to be updated.

B.

Choose the closest city to the project location and edit the climate data if necessary.

C.

Select any city in the same climate zone around the world and use that to certify the project.

D.

Choose the capital city to the project location and edit the climate data if necessary.