Secondary power shall automatically provide power to a protected premises system within how many seconds after the primary power fails?
Load testing of the control unit's VRLA batteries reveals that they must be replaced. Which two of the following are requirements for the replacement of VRLA batteries? (Choose two.)
Inspection records for all systems shall be kept for which length of time?
Which three of the following test methods are used to ensure that the smoke detectors are within their sensitivity range? (Choose three.)
What is the testing frequency of an engine driven generator?
Which of the following situations is considered an impairment?
According to NFPA 72, manual fire alarm boxes shall be located within which distance of each exit doorway on each floor?
The fire alarm control unit shows a supervisory signal on the display. What is the possible cause?
What is the testing frequency of a remote annunciator?
The inspection phase, as opposed to the testing phase, of system control equipment should concentrate on which of the following tasks?
Which three of the following are how a McCulloh transmitter should be inspected? (Choose three.)
Which two of the following are needed to perform a periodic test of a projected beam type smoke detector? (Choose two.)
Which three of the following branch circuit characteristics are required for circuit identification and accessibility of the fire alarm equipment's primary power supply? (Choose three.)
Secondary power for the fire alarm primary power supply shall be tested under which load?
When testing initiating devices, what is the maximum allowed time for the supervising station to verify receipt of the signal?
When a system must be fully or partially disabled for less than 8 hours, who must be notified when the system is restored?
A disconnection of the primary phone line shall cause which of the following events to occur?
How is a lead-acid battery inspected?
How often should radio transmitters be inspected?
How should the documentation cabinet be labeled?
Which two of the following should occur when a signal silence switch for a notification alarm is activated? (Choose two.)
After 15 years from initial installation, all fixed-temperature, nonrestorable heat detectors shall be replaced or have how many detectors per 100 laboratories tested?
Verification of a DACT’s trouble signal to the fire alarm shall be received within a maximum of how many minutes when the primary telephone line is disconnected?
When the main power is disconnected, how long should a power supply with emergency voice communication systems work in alarm mode?
How often are manual fire alarm boxes inspected?