Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dumps65

USGBC LEED-AP-ID+C Dumps

Page: 1 / 10
Total 100 questions

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Question 1

Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing, drift eliminators and energy star rating

B.

Makeup water meters, conductivity controllers and overflow alarms

C.

Non potable water sources, makeup water meters and bacteria testing

D.

Water treatment calculations, overflow alarms and system performance narrative

Question 2

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Question 3

For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?

Options:

A.

Copy rooms

B.

Break rooms

C.

Conference rooms

D.

Office building lobbies

Question 4

A project has access to two alternative water sources. How should they determine which source to use where?

Options:

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first, such as toilet flushing or irrigation

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All sources should be treated to potable water standards and used to supplement the municipal supply

Question 5

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Question 6

When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?

Options:

A.

Advanced Energy Metering

B.

Renewable Energy Production

C.

Green Power and Carbon Offsets

D.

Enhanced Refrigerant Management

Question 7

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Question 8

What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Demolition waste

B.

Plumbing fixtures

C.

Salvaged furniture

D.

Existing building conditions

Question 9

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design

C.

developing the LEED Scorecard

D.

implementing the Commissioning Plan

Question 10

Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

75% Rainforest Alliance Certified flooring with a total cost of $3,000 USD

B.

10% Rainforest Alliance Certified furniture with a total cost of $30,000 USD

C.

50% Rainforest Alliance Certified wood veneer with a total cost of $5,000 USD

D.

100% Rainforest Alliance Certified wheatboard with a total cost of $2,000 USD

Question 11

To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?

Options:

A.

Up to three layers of a floor assembly

B.

Items that are demolished and not replaced

C.

The interior side of exterior windows and doors

D.

Hazardous materials that are remediated as part of the project

Question 12

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

Options:

A.

owner

B.

architect

C.

contractor

D.

project manager

Question 13

What primary role does the LEED AP have during the LEED certification process?

Options:

A.

Runs weekly construction meetings

B.

Authors the Owner's Project Requirements (OPR) document

C.

Determines the LEED certification status of the project

D.

Helps project team members understand the rating system

Question 14

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

Options:

A.

Thermal comfort ranges, plug and process load needs

B.

Programmatic and operational parameters, and building schedule

C.

Transportation, building features, lighting levels and building envelope attributes

D.

Occupant's well-being, building site attributes, transportation and building features

Question 15

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

Options:

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

Question 16

When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?

Options:

A.

Location

B.

Climate zone

C.

ENERGY STAR® score

D.

Heating and cooling degree days

Question 17

Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?

Options:

A.

Only the design team members

B.

Owner, designer, and contractor

C.

All principal project team members

D.

Project team members with LEED® Credentials

Question 18

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

Options:

A.

Taxes and delivery costs

B.

Taxes and installation costs

C.

Installation equipment and labor

D.

Transportation costs and installation labor

Question 19

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

Options:

A.

Indoor Environmental Quality Credit, Acoustic Performance

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Optimize Energy Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Question 20

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

Options:

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Question 21

A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

Options:

A.

A car sharing program

B.

60 bike racks and seven shower/changing rooms

C.

Electric car charging stations in the parking garage

D.

A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

Question 22

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Question 23

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

Options:

A.

Included in the numerator only

B.

Included in the denominator only

C.

Included in both the numerator and denominator

D.

Excluded from both the numerator and denominator

Question 24

The use of MERV 13 (F7) air filters is required to obtain what credit?

Options:

A.

Energy and Atmosphere Credit, Advanced Energy Metering

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

D.

Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan

Question 25

A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control. Which lighting control could the design team specify to meet the credit requirements for open-office workstations?

Options:

A.

Standard on-off switches at each workstation

B.

Plug-in task light at each workstation that allow for on, off and a 50% light level

C.

Overhead lighting for the open-office space with fully automatic dimming via daylight sensors for the space

D.

Overhead lighting for the open-office space with controls that allow for on, off and a 50% light level for the space

Question 26

A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?

Options:

A.

Purchasing carbon offsets

B.

Providing operable windows

C.

Incorporating evaporative cooling

D.

Using multiple small packaged units

Question 27

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

Options:

A.

Minimum number of parking spaces required by the local zoning code

B.

Maximum dimensions for on-street parking spaces allowed by the local zoning code

C.

Minimum number of electric vehicle charging spaces required by the local zoning code

D.

Maximum number of levels in structured parking garages allowed by the local zoning code

Question 28

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

Options:

A.

Water-Related Systems

B.

Energy-Related Systems

C.

Indoor Air Quality Systems

D.

Waste Management Systems

Question 29

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Question 30

A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Indoor Environmental Quality Credit, Quality Views

C.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

D.

Energy and Atmosphere Credit, Fundamental Commissioning and Verification

Page: 1 / 10
Total 100 questions