Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: w75best

HP HPE0-V18 Dumps

Page: 1 / 12
Total 120 questions

HPE Edge-to-Cloud Fundamentals Questions and Answers

Question 1

A review of a customer's design produces five observations: a requirement about recovery time is unmet, the naming convention is inconsistent, one assumption about network capacity is unconfirmed, a component is a generation behind the current release, and installation is planned to be carried out by the customer's own team. Which observations should be raised as findings requiring action before commitment? (Choose two.)

Options:

A.

The naming inconsistency, since it will outlast the project and shape every later change.

B.

The unconfirmed capacity assumption, because the design must be reworked if it proves wrong.

C.

The component a generation behind, because newer options are available.

D.

The unmet recovery-time requirement, because the design does not do what was asked.

E.

The installation by the customer's own team, since mistakes during the build would delay go-live.

Question 2

A customer's deployed solution was built to run its order processing. The business now wants to analyse the large volumes of sensor data its warehouses produce, work the solution was never designed to carry, and asks whether it should simply add more of what it already has. What should the architect propose?

Options:

A.

More of the existing solution, since the team already knows how to operate it.

B.

An upgrade of the existing solution to its latest release, so it gains newer capabilities.

C.

A new capability designed for the sensor analysis, positioned alongside the order-processing solution.

D.

A delay until the sensor volumes are known well enough to size additional capacity precisely.

Question 3

A retailer has received a proposal and its board has approved it in principle. What should the proposal already have told them about what happens next? (Choose two.)

Options:

A.

What the customer itself has to provide or decide for the work to start.

B.

How the work is sequenced, and roughly when each part lands.

C.

What the engineers carrying out each stage are called.

D.

The internal approval route the board should follow to release funding.

E.

The contractual terms under which the work will be performed.

Question 4

A customer adopted a private cloud so that teams would stop waiting for environments without capacity being wasted. A year in, it asks how to tell whether the environment is delivering that. What should the architect point them at?

Options:

A.

The number of environments created and still running, rather than how long anyone waited for them.

B.

How the platform's running cost compares with the equivalent public capacity.

C.

The proportion of requests that required an exception to be granted.

D.

How long teams now wait for an environment, and how much of the pool is in use.

Question 5

What makes a recommendation persuasive to a customer?

Options:

A.

It visibly answers the problem they described, in their terms.

B.

It matches what the customer's competitors have recently deployed.

C.

It uses the newest offerings available in the portfolio at the time of writing.

D.

It includes more capability than the customer asked for, at the same price.

Question 6

During discovery, a customer's operations lead says any new system must use the monitoring tooling already in place. Its security lead says all new systems must be monitored through a separate platform the security team has just adopted, instead of the existing tooling. Neither is aware of the other's statement. How should the architect handle this? (Choose two.)

Options:

A.

Design to satisfy both, so that neither lead has to change position.

B.

Adopt the security requirement, since security constraints usually take precedence.

C.

Record both requirements rather than choosing between them privately.

D.

Adopt the operations requirement, since the existing tooling is already paid for.

E.

Bring the two leads together, so that the conflict is resolved by the customer rather than the supplier.

Question 7

A private cloud offers a defined catalogue of environments teams may request. What does the customer give up in exchange for the speed this provides?

Options:

A.

Some freedom for teams to specify environments that differ from the catalogue.

B.

Being able to see how much each of the teams is using across the whole of it.

C.

The option to expand capacity as demand grows over time.

D.

The ability to enforce security policy across the environments teams obtain.

Question 8

A customer wants to adopt a private cloud so its development teams can obtain environments without waiting. Today every request goes through a change board that meets weekly, and there is no agreed standard for what a development environment should contain. What must be addressed for the adoption to deliver what the customer wants? (Choose two.)

Options:

A.

Whether the development teams would prefer a different tool for submitting requests.

B.

A settled standard for what teams will be given when they ask.

C.

Which development team will be moved onto the private cloud first.

D.

Which categories of request no longer need individual approval.

E.

How long the weekly change board currently takes to approve a development environment.

Question 9

Reviewing a design, an architect concludes it meets every stated requirement, but that one requirement appears to rest on a misunderstanding that will cost the customer significantly. What should the review do?

Options:

A.

Record the design as deficient, since it will cost the customer more than necessary.

B.

Record that the design conforms, and raise the requirement separately as a question.

C.

Leave the requirement alone, since reviewing the brief, or amending it, is out of scope.

D.

Revise the requirement and re-review the design against the corrected version.

Question 10

A customer’s private cloud has reached the limit of its available capacity, and a development team’s request cannot be met. What does this tell the customer?

Options:

A.

The pool needs replenishing, since self-service cannot issue what does not exist.

B.

The requesting team exceeded its entitlement and should be asked to justify the request.

C.

Workloads should be moved to public capacity until the private environment is expanded.

D.

The self-service mechanism has failed and should be investigated as a defect.

Question 11

A start-up expects its user numbers to grow substantially over two years but cannot say how quickly. It has limited capital, a small engineering team that would rather build product than run infrastructure, and no regulatory constraint on where its data sits. Which characteristics should the positioned offering demonstrate? (Choose two.)

Options:

A.

The environment is dedicated to the start-up, so no other tenant can affect it.

B.

Capacity is reserved ahead of the user numbers the start-up expects, so nothing is ever held up.

C.

Day-to-day upkeep demands very few staff hours.

D.

The engineering team can move the product elsewhere within two years without penalty.

E.

Supply expands as the load actually rises.

Question 12

A logistics company wants to consolidate several ageing systems. It states that data about consignments must remain within the country it operates in, that its finance team wants costs to track usage rather than arriving as large periodic purchases, and that its own operations staff are few and already stretched. Which characteristics should the positioned offering demonstrate? (Choose three.)

Options:

A.

Charges move up and down with usage, rather than arriving in large lumps.

B.

Where consignment information physically resides can be evidenced, and constrained.

C.

Costs are fixed for a three-year term, so they can be planned precisely, and budgeted well ahead.

D.

Consignment data is replicated to a second country so a local failure cannot destroy it.

E.

Less routine work falls to the company's own operations staff than today.

Question 13

A customer says its problem with the current arrangement is not the amount it spends but the way the spending arrives. What is it describing?

Options:

A.

The difference between what was budgeted and what was actually spent.

B.

The shape of the cost over time, rather than its total.

C.

The proportion of spend going to services, rather than to equipment.

D.

What the whole thing costs to own, once the day to day effort is counted in.

Question 14

When is a solution review most valuable?

Options:

A.

At the point the customer raises its first operational issue.

B.

During the annual account planning cycle, alongside other reviews.

C.

Before the customer commits, while findings can still change the design cheaply.

D.

Immediately after deployment, when the built solution can be examined.

Question 15

Why are workload offerings, including those assembled with alliance partner components, described in terms of the workloads they serve rather than only by their components?

Options:

A.

Because a workload description is easier to price than a list of components.

B.

Because components change more frequently than the workloads they support.

C.

Because workload descriptions avoid disclosing technical specifications to competitors.

D.

Because customers arrive with a workload to run rather than with a component list to assemble.

Question 16

What does a customer most need a proposal to make clear about an expansion?

Options:

A.

What each of the added parts is rated to do, and where all of that has been written down for them.

B.

How things will be different for them once it is done, and what it will take to get there.

C.

The alternatives considered, and the reasons each was set aside during design.

D.

The vendor roadmap for these offerings, over the next three years.

Question 17

A customer with a small central operations team and a number of unstaffed edge sites is adopting a consistent Edge-to-Cloud management approach, expecting it to let the team run every site from one place. What must the proposal still provide for?

Options:

A.

A separate monitoring tool at each site, so that local problems are still seen.

B.

A dedicated administrator for each site, so that every location keeps its own expertise.

C.

A separate set of policies for each site, since unstaffed sites cannot follow central ones.

D.

Someone who can attend an unstaffed site, or remote hands, when hardware needs physical work.

Question 18

A customer has recently made a significant investment in components from one of the alliance partners and expects to keep them. How should this shape the proposal?

Options:

A.

The proposal should work with those components rather than around them.

B.

The proposal should present the option of replacing those components so the customer can compare.

C.

The proposal should treat those components as out of scope and address only what is new.

D.

The proposal should defer any decision involving those components to the partner directly.

Question 19

When a solution combines components from more than one supplier, where does difficulty most often arise?

Options:

A.

In the component supplied by the smaller of the two organisations.

B.

At the boundaries between the components.

C.

Within the component that carries the largest share of the workload.

D.

In whichever component was added to the solution most recently.

Question 20

A customer has three workloads to place across a solution assembled from HPE and alliance partner elements: a control system that must respond within milliseconds at a plant, a reporting system used by head office once a month, and a records archive subject to a residency rule and rarely accessed. Which placements follow from the constraints as stated? (Choose two.)

Options:

A.

The control system must run at the plant.

B.

The reporting system and the archive both run centrally, with only control at the plant.

C.

The archive sits where its residency rule can be demonstrated.

D.

The reporting system runs at the plant alongside the control system.

E.

The archive runs at the plant, since it is rarely accessed and needs little capacity.

Question 21

A customer states two requirements that pull against each other: everything must be recoverable within a very short window after a failure, and the total spend must stay inside a fixed cap that will not cover full duplication. How should the architect proceed?

Options:

A.

Ask the customer to raise the cap, since the two requirements cannot both be satisfied as stated.

B.

Establish with the customer which workloads genuinely need the short recovery window, and protect those.

C.

Design to the recovery requirement and present the resulting figure to the customer, since availability outranks cost.

D.

Design to the cost cap and note that the recovery window will not be met across the estate.

Question 22

What does the alliance partner ecosystem refer to in the context of positioning a solution?

Options:

A.

The industry bodies that publish the standards the solution conforms to.

B.

The other suppliers whose components combine with HPE's in a customer solution.

C.

The resellers through which a customer places its order.

D.

The customer's own internal teams that will operate the solution.

Question 23

An architect reviews a customer's deployed solution and concludes it has ample headroom for their foreseeable needs. What follows for an expansion proposal?

Options:

A.

A proposal should still be prepared, framed around future growth the customer may experience.

B.

The finding should be kept internal, since it weakens the account position.

C.

A proposal should be prepared for the newer generation of the deployed offering.

D.

There is no case for one, and saying so is the right advice.

Question 24

A customer is planning a solution built on technology its own team has not worked with before. It wants confidence that the design is sound, but nobody on the team has the expertise to judge it before the build begins. How should HPE Services be positioned?

Options:

A.

As an operational service that takes over the running of the solution once it is live.

B.

As training delivered to the team once the solution has been built and handed over.

C.

As a review of the solution after it has been in service for a few months.

D.

As expert advice within the design work, so it is judged by people who know the technology.

Question 25

An architect is writing the recommendation section of a proposal. Which elements belong in a recommendation, as distinct from the discovery that preceded it? (Choose two.)

Options:

A.

The offering being proposed and why it suits this customer.

B.

How the proposal answers each requirement the customer stated.

C.

The list of questions the architect asked during discovery.

D.

A summary of the customer's existing estate as it was found.

E.

A record of who was interviewed and when during the discovery sessions.

Question 26

Why does an architect consider the alliance partner ecosystem when positioning a solution?

Options:

A.

Because partner components are usually less expensive than the equivalent alternatives available elsewhere.

B.

Because the customer's workloads usually depend on components from more than one supplier.

C.

Because a solution must include at least one partner component to be supportable.

D.

Because partner components remove the need to assess the customer's existing estate.

Question 27

A customer asks how much spare capacity its private cloud should hold beyond current demand. What should the answer be based on?

Options:

A.

How long it takes to add capacity, and how fast demand grows in that time.

B.

A fixed proportion of total capacity, applied consistently and reviewed year to year.

C.

The largest single request the environment has ever had to satisfy.

D.

Whatever capacity remains unallocated at the end of each quarter.

Question 28

After discovery, an architect concludes that the customer's existing arrangement already meets the requirement they raised, and that the difficulty lies in how it is being used. What is the appropriate recommendation?

Options:

A.

Recommend replacement, since the current arrangement will eventually need refreshing anyway.

B.

Recommend a modest addition anyway, since the engagement was opened on that basis.

C.

Report that finding, and address the way the arrangement is being used rather than replacing it.

D.

Report the finding but leave the usage problem with the customer to resolve.

Question 29

An architect is preparing to place a workload that exchanges data continuously with two other systems the customer runs, one of them supplied by an alliance partner. What must be established before its location is chosen?

Options:

A.

How much storage the workload will consume in its first year.

B.

Where the systems it exchanges data with are located.

C.

Whether the workload has been virtualised in its current environment.

D.

Which team within the customer will administer the workload.

Question 30

What does a well-described customer use case contain? (Choose two.)

Options:

A.

The date by which the customer needs the solution in service.

B.

The outcome the customer is trying to accomplish.

C.

What budget the customer has allocated for the work.

D.

The conditions the solution has to work within.

E.

The offering the customer expects to be recommended.

Question 31

A customer wants analysis performed at its factory sites, where results must be acted on quickly. The analysis software it has chosen comes from an alliance partner, and the partner supports running it only in a central data centre. How should the architect approach placement?

Options:

A.

Run the partner's software at the sites regardless, since the placement need outweighs the support terms.

B.

Run everything centrally, since the partner's support terms settle where the analysis has to happen.

C.

Pause the design until the partner agrees to support running the software at the sites.

D.

Split the work, or choose a different component, so that what must run at the sites is supported there.

Question 32

A customer operates sites connected by links that are reliable most of the time but occasionally drop for several hours. What should this establish about any offering positioned for those sites?

Options:

A.

It must be sized for traffic that accumulates, then clears, after an outage.

B.

It must include a second link so that the sites are never disconnected.

C.

It must behave acceptably during an outage of several hours, not merely recover afterwards.

D.

It must be hosted centrally so that outages affect only local access.

Question 33

Which characteristics describe a private cloud solution? (Choose two.)

Options:

A.

Capacity is drawn from a pool shared with other organisations.

B.

Resources are provided to users through a self-service request model.

C.

Physical infrastructure is necessarily located on the organisation's own premises.

D.

Users are billed individually for each request they submit.

E.

The environment is dedicated to a single organisation.

Question 34

An architect intends to include a component from an alliance partner in a customer solution. What should be established before it appears in the proposal?

Options:

A.

That the combination has been proven to work as the solution will use it.

B.

That the partner's component is the market leader in its category.

C.

That the partner will price the component more keenly if it is ordered with the rest.

D.

That the customer has no existing relationship with a competing supplier.

Question 35

A customer is deciding which of its existing workloads to move into a newly built private cloud first. Which characteristic makes a workload a good early candidate?

Options:

A.

It is well understood and its dependencies are already documented.

B.

It is the workload the business considers least important, however little it is understood.

C.

It is the largest workload, so the benefit of moving is greatest.

D.

It is due for replacement within the next year in any case.

Question 36

An architect has identified an offering, built on an alliance partner component, that matches a customer's workload profile closely on capability and cost. The customer has separately said that its operations team must be able to manage anything new using the process it already runs, and the identified offering would require that team to adopt a separate operating model. How should this affect the positioning?

Options:

A.

The offering should be dropped, and the customer shown only the option being positioned in its place.

B.

The mismatch has to be surfaced with a way to close it, or another option positioned, since it is a stated requirement.

C.

The offering should still be positioned, because capability and cost are the criteria that decide between competing solutions.

D.

The operations team should be asked to revise its process, since the offering fits the workload well.

Page: 1 / 12
Total 120 questions