Summer Sale Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

HP HPE7-V01 Dumps

Page: 1 / 5
Total 50 questions

Advanced HPE Edge-to-Cloud Solutions Questions and Answers

Question 1

Which statement about HPE SimpliVity is true?

Options:

A.

HPE SimpliVity 380 Gen11 cluster with compute nodes requires the same CPU in all nodes.

B.

Mixing AMD and Intel chassis in the same federation is fully supported.

C.

A single AMD-based HPE SimpliVity node can support up to 4 non-HPE SimpliVity servers.

D.

A single Intel-based HPE SimpliVity node can support up to 8 non-HPE SimpliVity servers.

Question 2

Your customer requires a data protection solution that will support their workloads running on an HPE Alletra MP B10000 storage array.

Your customer requirements include:

    Protecting VMware vSphere workloads

    Covering different hypervisors

    Pay-per-use model

    Near synchronous and block-level replication

Select the most appropriate solution.

Options:

A.

HPE Zerto

B.

HPE Data Ops Manager

C.

HPE Alletra Storage Server 4120

D.

HPE StoreOnce 3660

Question 3

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from drives located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal contains:

    3 HPE Synergy 12000 frames

    2 HPE Synergy Composer2 modules

    4 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 HPE Synergy 50Gb Interconnect Link Modules

    3 HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core vSphere Enterprise Plus subscriptions

    36 HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

Options:

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Question 4

A customer requested a quote for a 64Gb Fibre Channel system between two data centers with a distance of 95 KM / 60 MI between the locations, with a requirement for 14 F-ports on each switch.

Refer to exhibit

as

Which statement is true about the given configuration?

Options:

A.

A Short Wave transceiver must be removed to install the Long Wave transceiver.

B.

A Fibre Channel license needs to be modified for Extended Fabric to support the required distance.

C.

A SFP56 or SFP56-DD port can be used for the Long Wave transceiver when all SFPs are inserted.

D.

A port range of 39 to 47 can be used for the LW transceiver if ports 0 to 23 are used for SW.

Question 5

Your customer plans to deploy multiple virtual machines running database workloads. They plan to re-use and extend an existing Synergy, 3PAR, and VMware infrastructure.

What is true regarding a possible upgrade?

Options:

A.

HPE OneView for VMware vCenter can be used to deploy additional ESXi hosts.

B.

HPE OneView for Ansible Orchestrator can be used to deploy the operating system to new ESXi hosts.

C.

HPE 3PAR cannot be used with VMware infrastructure running on Synergy.

D.

HPE OneView can be used for rapid VM deployment.

Question 6

Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.

The customer requirements include:

    30 compute nodes to support their virtualization workloads

    Redundancy within the management subsystem

    An in-frame storage solution to support vSAN

    A guidance/automation technology with HPE Aruba to virtualize WWNs

    Simplified management with a single logical enclosure

You are reviewing the following proposal:

    3 x HPE Synergy 12000 frames

    2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE D3940 Storage Modules with maximum number of drives

    6 x HPE Composer2 + 30 x HPE OneView Advanced licenses

    30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate mezzanine cards

Which statement about the proposal is true to help meet the customer requirements?

Options:

A.

Additional HPE OneView Advanced licenses should be added for the HPE Virtual Connect modules and HPE D3940 Storage Modules.

B.

HPE 32Gb Fibre Channel switches should be added to the proposal to enable WWN virtualization and profile mobility.

C.

Each frame should be equipped with two HPE 12Gb SAS switches to provide connectivity between compute nodes and D3940 Storage Module.

D.

3 x HPE Composer 2 modules can be removed from the proposal, as you need one HPE Composer2 module per HPE Synergy frame for enhanced availability.

Question 7

Your customer wants to simplify storage management for their VMware-based environment by configuring HPE Storage Integration Pack for VMware vCenter Server. They want to use HPE OneView for VMware vCenter Server for ESXi deployment.

Currently, they have 30 HPE ProLiant DL360 Gen11 deployed with ESXi 8.x and they plan to add 30 additional systems with exactly the same setup. Storage capacity is provided by HPE Alletra Storage MP B10000.

Which statement about the configuration and customer requirements is true?

Options:

A.

HPE Storage Integration Pack for VMware vCenter Server and HPE OneView for VMware vCenter Server only support the HPE Synergy platform managed using HPE Composer2.

B.

Your customer must purchase the appropriate number of licenses for HPE Storage Integration Pack for VMware vCenter Server and HPE OneView for VMware vCenter Server.

C.

Using HPE Storage Integration Pack for VMware vCenter Server for VVol creation is only supported if the ESXi systems have vSphere Enterprise Plus subscriptions.

D.

HPE OneView for VMware vCenter Server supports the Proactive HA feature, which will define the response in case of host health degradation to improve workload availability.

Question 8

Your customer wants to implement a disaster recovery solution for their virtualization workload. They also want to implement a protection method that will protect the workload in case of a site failure.

Their existing environment includes the following configurations:

    All ESXi systems are located in the same datacenter

    Virtual machines are protected by an HA cluster

    Some of the VMs are protected with Fault Tolerance

    HPE Synergy 480 Gen11 is the compute platform

    HPE Alletra Storage MP B10000 array for storage

    Orchestrated failover for all VMs using VMware tools

The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.

Which component or configuration is a necessary part of a solution that will meet all customer requirements?

Options:

A.

HPE Synergy frames from the secondary site added to the logical enclosure configured in the primary site.

B.

Storage policy-based management (SPBM) must be configured for a group of the virtual machines.

C.

Synchronous replication configured between sites to replicate the volumes used to build the datastores.

D.

Asynchronous replication configured between sites used to replicate the volumes used to build the datastores.

Question 9

You presented a solution to your customer that will replace their legacy HPE BladeSystem.

The new solution is based on the HPE Synergy platform and consists of the following components:

    5 HPE Synergy 12000 frames

    2 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    8 HPE Synergy 25/50Gb Interconnect Link Modules

    60 HPE Synergy 480 Gen11

Which statement about the business and financial benefit of the new solution for the customer is true?

Options:

A.

HPE Synergy 480 Gen11 compute modules have an extension that will allow the customer to install 4 GPUs in half-height format compute nodes.

B.

HPE Virtual Connect SE 100Gb F32 Module for Synergy can support FC traffic once an upgrade license for each module is added in HPE OneView.

C.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more expansion slots in the form of mezzanine cards.

D.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more interconnect modules, which provides better flexibility and expansion possibilities.

Question 10

Your customer has requested a solution with HPE Alletra Storage MP B10000 that needs four SFP28 ports per node, for iSCSI connectivity.

as

A junior architect has prepared a BOM for the solution.

What needs to be changed in the BOM to meet the requirement?

Options:

A.

Remove the 52564A HBAs and add Q2P64B XCVRs to the BOM.

B.

Add two 52564A HBAs to the BOM.

C.

Add four Q2P64B XCVRs to the BOM.

D.

Replace the 52564A HBAs with R7C82A HBAs in the BOM.

Question 11

Your customer has a requirement to support 500K IOP/s write speeds in their environment.

as

What change should you make to the configuration to achieve this?

Options:

A.

Replace the nodes with B91160 model and add additional drive shelf and more drives.

B.

Replace the nodes with B91130 model and add additional drive shelf.

C.

Increase the amount of drives supported to achieve the requirement.

D.

Replace the nodes with B10230 model and add additional drive shelf and more drives.

Question 12

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal consists of:

    3 x HPE Synergy 12000 frames

    2 x HPE Synergy Composer2 modules

    4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core VMware vSphere Enterprise Plus subscriptions

    36 x HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

Options:

A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Question 13

Your customer has a combination of HPE and non-HPE equipment.

Which is the correct functionality available in Aruba Fabric Composer for this customer’s environment?

Options:

A.

Management and monitoring of HPE Alletra Storage MP B10000 arrays.

B.

Configuration of SAN zoning on ArubaOS-CX 8400 switches.

C.

Management of Pensando cards in the servers.

D.

VLAN visibility of VMware on non-HPE servers.

Question 14

Your customer would like to implement Peer Persistence for their HPE Alletra 6000 remote replication configuration.

Which two statements are true? (Select two.)

Options:

A.

Downstream array works as a witness.

B.

The upstream volume reports active paths; downstream reports standby.

C.

Both arrays can host upstream and downstream volumes.

D.

Upstream array works as a witness.

E.

Peer Persistence only works for FC host connectivity.

Question 15

Your customer is planning a Scality RING solution. Approximately 750 TB of data must be stored on the SDS. The customer prefers SSD or NVMe drives.

What is true regarding this solution?

Options:

A.

HPE servers, for example, such as Alletra Storage Server 4120, can be used for Scality RING deployments.

B.

The minimum capacity for ordering Scality RING perpetual licenses is 1000TB.

C.

Scality RING Single Site Hardware Lifetime licenses are provided at a lower cost compared to perpetual licenses.

D.

Scality licenses cannot be purchased from HPE.

Page: 1 / 5
Total 50 questions