Summer Sale Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

Huawei H19-260_V2.0 Dumps

HCSA-Sales-Smart PV V2.0 Questions and Answers

Question 1

Huawei optimizers can be adapted to all residential inverters.

Options:

A.

True

B.

False

Question 2

The JMF activity application and acceptance initiator is:

Options:

A.

Huawei and partners

B.

Huawei

C.

Partners

Question 3

What are the challenges facing enterprises in building photovoltaic?

Options:

A.

Distributed power plants cannot be managed in a unified manner.

B.

Unable to make full use of roof area

C.

High efficiency modules are not available

D.

Poor development quality of PV power plants and many faults

E.

Hidden safety hazards of power station system

Question 4

Under the premise of complying with local laws and regulations, partners at all levels are allowed to carry out distribution business only within the authorized regions.

Options:

A.

True

B.

False

Question 5

If a fire occurs on energy storage equipment, after the fire is extinguished, how long should the spraying continue to ensure that the equipment temperature drops below 65°C? ( )

Options:

A.

> 4 hours

B.

0.5 hour

C.

≥ 2 hours

D.

≥ 1 hour

Question 6

Which of the following is not a key activity for the SQA key role as a "continuous improvement pusher"? ( )

Options:

A.

Focus on the safety and quality results of product delivery and O & M, be target-oriented, and carry out safety and quality planning. Ensure that no safety accident and quality accident occur.

B.

Establish and implement the continuous improvement mechanism, instruct service personnel to apply scientific safety and quality engineering methods for analyzing problems and making improvement.

C.

Establish an incentive mechanism for continuous improvement, and regularly summarize and commend continuous improvement work.

D.

Regularly organize efforts to identify safety and quality improvement points and drive the continuous improvement of business.

Question 7

Huawei residential PV+ESS off-grid solution includes the whole-house backup box.

Options:

A.

True

B.

False

Question 8

Huawei's industry-first DC-to-ground protection solution, what is the time required to cut off a ground fault?

Options:

A.

60 ms

B.

10 ms

C.

30 ms

D.

15 ms

Question 9

Which of the following statements about the design principles of the medium-voltage micro-grid solution is incorrect?

Options:

A.

Ratio PV inverter power and PCS power ≤ 1:1

B.

The number of PCSs corresponding to each ESS must be the same.

C.

A diesel generator must be configured for the micro-grid to prevent the system from losing the black-start power supply after the energy storage is exhausted.

D.

PCS power/Peak power in steady state ≥ 2.0

Question 10

How much energy yield does Huawei optimizer's module-level optimization technology increase by reducing the mismatch impact?

Options:

A.

> 50%

B.

1~5%

C.

5~30%

D.

> 30%

Question 11

Safety signs are composed of safety colors, geometric shapes, and symbols. What are the types of safety signs? ( )

Options:

A.

Information

B.

Mandatory action

C.

Prohibition sign

D.

Warning sign

Question 12

What are the value features of the optimizer?

Options:

A.

Safety voltage fast shutdown

B.

Increases the PV string power yield in shadowed areas.

C.

Increases the overall energy yield of multi-directional rooftop PV strings.

D.

Module-level monitoring

Question 13

Synchronous adjustment camera is a synchronous motor without mechanical load. It automatically increases reactive power output when the voltage of the grid rises and absorbs reactive power when the voltage of the grid drops to maintain the voltage, improve the stability of the power system and improve the power supply quality of the system

Options:

A.

True

B.

False

Question 14

What is not the function of the optimizer?

Options:

A.

AFCI

B.

Enable more eligible PV area and higher yield

C.

Module-level management

D.

RSD

Question 15

The DC fault of the PV system is the biggest security risk of the power station. Huawei uses () to proactively shut down the DC system to prevent the fault from spreading.

Options:

A.

Fire suppression system

B.

Smart terminal temperature monitoring

C.

MPPT insulation monitoring

D.

Smart string disconnection

Question 16

The intelligent fusion diagnosis system (IV & CV fusion) integrates IV scanning and UAV AI image recognition technologies to implement two converged diagnosis modes: IV and UAV associated inspection, site-wide scanning, and cross-verification.

Options:

A.

True

B.

False

Question 17

Which of the following micro-grid scenarios requires a backup time of more than 6 hours?

Options:

A.

Industrial and commercial load micro-network

B.

New city micro-grid

C.

Civil load-like micro-grid

D.

Industrial load micro-grid

Question 18

Traditional inverters use the manual string shutdown solution to disconnect equipment internal fault or PV modules fault.

Options:

A.

True

B.

False

Page: 1 / 6
Total 60 questions