HCSA-Sales-Smart PV V2.0 Questions and Answers
Huawei optimizers can be adapted to all residential inverters.
The JMF activity application and acceptance initiator is:
What are the challenges facing enterprises in building photovoltaic?
Under the premise of complying with local laws and regulations, partners at all levels are allowed to carry out distribution business only within the authorized regions.
If a fire occurs on energy storage equipment, after the fire is extinguished, how long should the spraying continue to ensure that the equipment temperature drops below 65°C? ( )
Which of the following is not a key activity for the SQA key role as a "continuous improvement pusher"? ( )
Huawei residential PV+ESS off-grid solution includes the whole-house backup box.
Huawei's industry-first DC-to-ground protection solution, what is the time required to cut off a ground fault?
Which of the following statements about the design principles of the medium-voltage micro-grid solution is incorrect?
How much energy yield does Huawei optimizer's module-level optimization technology increase by reducing the mismatch impact?
Safety signs are composed of safety colors, geometric shapes, and symbols. What are the types of safety signs? ( )
What are the value features of the optimizer?
Synchronous adjustment camera is a synchronous motor without mechanical load. It automatically increases reactive power output when the voltage of the grid rises and absorbs reactive power when the voltage of the grid drops to maintain the voltage, improve the stability of the power system and improve the power supply quality of the system
What is not the function of the optimizer?
The DC fault of the PV system is the biggest security risk of the power station. Huawei uses () to proactively shut down the DC system to prevent the fault from spreading.
The intelligent fusion diagnosis system (IV & CV fusion) integrates IV scanning and UAV AI image recognition technologies to implement two converged diagnosis modes: IV and UAV associated inspection, site-wide scanning, and cross-verification.
Which of the following micro-grid scenarios requires a backup time of more than 6 hours?
Traditional inverters use the manual string shutdown solution to disconnect equipment internal fault or PV modules fault.