Black Friday Flash Sale - Everything Must Go at 75% Off - Ends in 0d 00h 00m 00s - Coupon code: w75best

Huawei H19-465_V1.0 Dumps

HCSA-Presales-AI V1.0 Questions and Answers

Question 1

Which of the following are the primary roles of Huawei AI storage in inference?

Select all that apply.

Options:

A.

Reducing the first token generation duration

B.

Reduce system power consumption

C.

Improve the cluster throughput

D.

The assistant system supports longer sequence inference.

Question 2

How long is typically needed to pre-train a model?

Options:

A.

More than 1 month

B.

3 weeks

C.

2 weeks

D.

1 week

Question 3

To lower the data center’s energy consumption, the data-center equipment room uses a hybrid cooling approach of “air and liquid.” Which statement about “air” is correct?

Options:

A.

Natural air cooling

B.

Comfortable air conditioning cooling

C.

Precision air conditioner cooling

D.

Electric fan cooling

Question 4

What are the primary features of the liquid-cooling solution in new AI equipment-room scenarios?

Select all that apply.

Options:

A.

Improved computing power per unit of electricity consumed

B.

1 week go-live

C.

PUE=1.6

D.

Low Capex investment

Question 5

What functions does the AI tool SCT Info-Finder support in Huawei’s Xinghe Intelligent Network solution?

Select all that apply.

Options:

A.

AI configuration generation

B.

AI virus detection

C.

AI bid analysis

D.

AI intelligent selection

Question 6

What are the main functions of the KV cache during inference for an AI foundation model?

Select all that apply.

Options:

A.

Significantly improve inference efficiency

B.

Improve the utilization of HBM

C.

Improve computing power utilization

D.

Reduce repeated calculations in the inference steps

Question 7

In data-center networks, Huawei’s proposed Xinghe Intelligent Network solution supports network automation, service automation, and operations-and-maintenance automation. Which of the following is a key feature used by this solution to enable service automation?

Options:

A.

Network-level load balancing (NSLB)

B.

Hitless upgrade

C.

Network simulation verification

D.

Runbook framework orchestration

Question 8

TaiShan is a Huawei-developed server product built on Kunpeng.

Options:

A.

TRUE

B.

FALSE

Question 9

Which aspects of intelligent-computing data centers impose high requirements on O & M assurance?

Select all that apply.

Options:

A.

Cluster training is interrupted due to a single device fault.

B.

The performance of a single node in the cluster affects the overall performance.

C.

Training of trillion parameter models is a large-scale application for the entire system, involving a large number of components.

D.

An intelligent computing server has eight cards, and a single card failure does not affect the training.

Question 10

The cluster training solution enables model training at the 10-billion-, 100-billion-, and 1-trillion-parameter levels, and offers multiple mature networking solutions for flexible scaling.

Options:

A.

TRUE

B.

FALSE

Question 11

Which of the following statements accurately describe the data-affinity feature of the Application Enablement Suite BoostKit?

Options:

A.

Local Computing

B.

Parallel Processing

C.

Algorithm Acceleration

D.

Full-lifecycle Security

Question 12

Which of the following computing capabilities has expanded from the device side into the server market and become a new choice for general computing?

Options:

A.

ARM

B.

x86

C.

MIPS

D.

RISC-V

Question 13

What are the main highlights of Huawei AI storage for AI training?

Select all that apply.

Options:

A.

Multi-protocol interworking and zero-copy data transfer improve the efficiency of the entire AI process. The performance and capacity can be expanded on demand to smoothly evolve to ultra-large clusters of 10,000 or 100,000 cards, multimodal models, and models with trillions of parameters.

B.

Multi-level reliability mechanism ensures zero data loss and zero service interruption, thereby guaranteeing stable running of AI services.

C.

Integrated storage and compute data direct access, supporting Ascend NDS and NVIDIA GDS, enabling efficient data read/write through direct data access to computing power.

D.

10 TB bandwidth and hundreds of millions of IOPS deliver ultimate performance. Data loading and checkpoint loading after a breakpoint or fault recovery are now completed in seconds instead of hours, improving cluster utilization.

Question 14

On which plane are read and write operations for sample data carried out between compute nodes and storage nodes?

Options:

A.

Management plane

B.

Sample plane

C.

Service plane

D.

Parameter plane

Question 15

Which statement about the new TaiShan 200 model server is correct?

Options:

A.

Up to 10 PCIe slots

B.

Supports 920 processors

C.

Does not support NVMe SSDs

D.

Temperature range: 5°C to 35°C

Question 16

Which statement about TaiShan 200 series servers is not incorrect?

Options:

A.

MTBF 150,000 hours

B.

Supporting outdoor deployment

C.

Triple anti-vibration hard disk & carrier-class components

D.

112G high-speed interconnection (CPU and I/O connection rate)

Question 17

The CCAE Cluster Operation and Management System shifts cluster management from “single-domain mode” to “centralized governance,” enabling complete visibility and control of training job paths throughout the system.

Options:

A.

TRUE

B.

FALSE

Question 18

The operating system is the key to unlocking diverse computing power and the soul of the information technology industry.

Options:

A.

TRUE

B.

FALSE

Page: 1 / 6
Total 60 questions