Weekend Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dumps65

iSQI CTFL-PT_D Dumps

Page: 1 / 4
Total 40 questions

ISTQB Certified Tester Foundation Level - Specialist Performance Testing Questions and Answers

Question 1

Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?

1.It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.

2.The scripts should always include logical rules.

3.Manual intervention may be required to carry out remedial action in the event of an error.

4.Performance scripts should be subject to quality control and testing, just like any software product.

5.The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.

SELECT ONE OPTION

Options:

A.

True statements: II, IV.

B.

True statements: 111, V.

C.

True statements: III, IV.

D.

True statements: I, IV.

Question 2

Choose the VALID description of the ramp-up concept.

SELECT ONE OPTION

Options:

A.

Stage of reaching the stationary state.

B.

Stage of finishing the test.

C.

Stage of exit from a stationary state by increasing the number of concurrent users.

D.

Technique in which the load on the system is increased to a certain value in the shortest possible time.

Question 3

Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems

SELECT ONE OPTION

Options:

A.

Direct measurement from a dynamic performance test.

B.

Analysis and elaboration of metrics from a dynamic performance test.

C.

Direct measurement through a performance monitoring tool.

D.

Scan server logs and compile metrics from them.

Question 4

Choose the ONE option that describes the example of a transaction. The scenario for this question is the transfer of an amount of money from one bank account to another.

SELECT ONE OPTION

Options:

A.

Request transfer of X Monetary Units from account K to account P; reduce the balance of account K by X Monetary Units; Increase the balance of account P by X Monetary Units. If the reduction and Increase have been correctly applied, then apply changes.

B.

Request transfer of X Monetary Units from account K to account P; increase the balance of account P by X Monetary Units. If the increase in account P has been correctly applied, then apply changes.

C.

Request transfer of X Monetary Units from account K to account P; decrease the balance of account K by X Monetary Units. If the reduction in account K has been correctly applied, then apply changes.

D.

Request transfer of X Monetary Units from account K to account P; reduce the balance of account K by X Monetary Units; increase the balance of account P by X Monetary Units. If the reduction or increase has been correctly applied, then apply changes

Question 5

Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).

1.Load generator.

2.Load management console.

3.Monitoring tool.

1.It monitors, records and/or analyzes the behavior of the component or system under test.

2.It creates the load and also collects the metrics for later communication.

3.It provides the control to start and stop the creation and execution of the user simulation.

4.It aggregates metrics from the various transactions that are defined within the load instances

5.It creates and runs multiple client instances that simulate user behavior.

6.It can effectively support a root cause analysis of performance in a system under test.

SELECT ONE OPTION

Options:

A.

1A- 1E-2A-2C-2D-3F.

B.

1B-1E-2C-2D-3A-3F.

C.

1B-1A-2A-2D-3C-3F

D.

1B- 1F-2C-2F-3A-3D.

Question 6

In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.

Question

What could be the reason why it is not possible to play back the script?

SELECT ONE OPTION

Options:

A.

The lack of business logic.

B.

The test script has not been correlated.

C.

The length of the script.

D.

The missing Initialization section.

Question 7

Identify the correspondences between performance measures and metrics (1 -6) and the different environments (A C) in which performance evaluation is needed.

1.Alerts and warnings.

2.Concurrency of usage.

3.Operational processes.

4.Resource utilization.

5.Response time.

6.Throughput of data, transactions, and other units of work performed.

1.Operating environment.

2.Business environment.

3.Technical environment.

SELECT ONE OPTION

Options:

A.

1A-2C-3C-4A-5C-6B.

B.

1B - 2B - 3A - 4B - 5C - 6A.

C.

1A-2B-3A-4C-5C-6B.

D.

1A-2B-3C-4C-5A-6C.

Question 8

Choose the MOST suitable description of the structure of a performance test script

SELECT ONE OPTION

Options:

A.

The Initialization section Is the section in which everything Is prepared for the main part, the main sections are executed only once, because If It is necessary to repeat any action the whole script or part of it must be repeated and the clean-up section Is the section where the necessary steps are carried out to finish the test correctly.

B.

The clean-up section Is the section in which everything is prepared for the main part In order to comply with the preconditions, the main sections can be executed several times and the completion section is the section that takes care of recording the results In the corresponding repository.

C.

The initialization section Is the section in which everything Is prepared for the main part, the main sections can be executed several times and the finalization section is the section in charge of registering the results In the corresponding repository.

D.

The Initialization section is the section in which everything Is prepared for the main part, the main sections can be executed several times and the clean-up section is the section where the necessary steps are carried out to finish the test correctly.

Question 9

Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).

1.Endurance testing

2.Scalability testing

3.Capacity testing

4.Stress testing

5.Concurrency testing

1.Type of testing focused on the ability of a system to meet future efficiency requirements.

2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.

3.Type of testing focused on the stability of the system over a specific time frame.

4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.

5.Type of testing focused on the impact of situations where specific actions occur simultaneously.

SELECT ONE OPTION

Options:

A.

1C-2D-3E-4B-5A

B.

1B-2A-3D-4C-5E

C.

1B-2E-3A-4D-5C

D.

1C - 2A - 3D - 4B - 5E

Question 10

In which activity of the testing process is the scope of performance testing established?

SELECT ONE OPTION

Options:

A.

Test analysis.

B.

Test design.

C.

Test planning.

D.

Test monitoring and control.

Question 11

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.

The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.

Question

How many departing passengers access the front-end only once to check in per hour?

SELECT ONE OPTION

Options:

A.

187.50 departing passengers / hour

B.

1,218.75 departing passengers / hour.

C.

625.00 departing passengers / hour.

D.

812.50 departing passengers / hour.

Question 12

Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.

k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• The project follows a sequential development life cycle model.

Question

Which is the right moment in the project to analyze and evaluate the performance risks?

SELECT ONE OPTION

Options:

A.

After design but before coding.

B.

During the requirements activities and again before running the performance test.

C.

During the analysis and design activities as well as, again, before each performance test cycle.

D.

Repeatedly throughout the development phases (including requirements activities) and the performance test itself.

Page: 1 / 4
Total 40 questions