Question 1

A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.

The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.

You need to define the production life cycle stages.

Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

as

Options:

Question 2

A manufacturer uses Dynamics 365 Supply Chain Management to build bicycles.

When manufacturing releases production orders to the warehouse, the warehouse must avoid automatically releasing the bill of materials (BOM) and formula lines. The BOM and formula lines must be manually released later through a batch process.

You need to configure the functionality for the records.

At which two locations should you configure this functionality? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

item model group

B.

site

C.

warehouse

D.

legal entity

E.

production order

Question 3

A manufacturer is implementing master planning in Dynamics 365 Supply Chain Management for planned orders.

Master planning is running for the first time in the production environment.

You need to instruct the production planners where to view the following information:

• Planned orders that are created in a run.

• An item's planned orders against the demand over user-defined periods of time.

In which two possible locations can the information be found? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Net requirements form

B.

Supply Schedule form

C.

Sequenced planned orders

D.

Item requirement statistics

E.

Planned orders

Question 4

A manufacturer uses route operations and job scheduling. You use a unique calendar for a conveyor line.

The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.

You need to adjust the efficiency percentage for the conveyor line calendar.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

as

Options:

Question 5

A manufacturing company uses Dynamics 365 Supply Chain Management.

The shop floor has multiple pieces of the same model of equipment. The equipment produces a finished good that requires special handling.

The equipment has a visual guide available. The shop floor manager requires the following:

• The most recent visual guide must be available for all pieces of the equipment at the same time.

• The shop floor workers must have a visual guide available for handling of the finished good.

You need to configure the visual guides to meet the shop floor requirements.

What should you configure for each requirement? To answer, drag the appropriate features to the correct requirements. Each feature may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

as

Options:

Question 6

You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.

You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.

You have set up the default Start user options for all production orders as shown in the exhibit below.

as

as

Options:

Question 7

A company uses Dynamics 365 Supply Chain Management for Process manufacturing.

You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.

You need to optimize the planned production orders.

What should you do?

Options:

A.

In Planned orders, combine the production orders.

B.

Firm the orders.

C.

Rerun master planning. Select the dynamic plan with a coverage time fence of two weeks.

D.

Rerun master planning. Select the static plan with a coverage time fence of two weeks.

Question 8

A manufacturing plant uses lean manufacturing Operators process Kanban consumption manually using a mobile device.

The production team must use automatic empty registration for some of the event. Unbars Registration must occur when the last job of a Kanban is completed.

You need to update the Kanban rule to meet this requirement.

What Kanban should you update?

Options:

A.

Set a fired Kanban quantity.

B.

Select to register as empty when handling units are received.

C.

Select to register as empty when the source requirement is registered.

D.

Select to manually register as empty

Question 9

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

as

Options:

Question 10

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Question 11

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Route card journal

B.

Standard production order update

C.

Handheld warehouse device

D.

Job card journal

E.

Report as finished journal

Question 12

You need to configure the manufacturing groups for the standard model bicycle and the new limited-edition bicycle for the summer season.

Which object should you use?

Options:

A.

Commerce channels

B.

Operating units

C.

Teams

D.

Legal entities

E.

Departments

Question 13

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Question 14

You need to create production orders for the new summer limited-edition bicycles.

How should they be created? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 15

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

as

Options:

Question 16

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

as

Options:

Question 17

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 18

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Question 19

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Ignore scheduled execution

B.

Asset

C.

Tool

D.

Worker

E.

Ignore schedule

Question 20

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

Options:

A.

Use the default functional location

B.

Create a functional location.

C.

Create a location profile.

D.

Create a location type.

Question 21

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

as

Options:

Question 22

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 23

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Assign new engineering version for parent BOM.

B.

Enable active for planning for lifecycle status.

C.

Assign lifecycle state for parent BOM.

D.

Disable active for planning for lifecycle status.

E.

Assign lifecycle state for subassembly.

Question 24

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

as

Options:

Question 25

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Question 26

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

as

Options:

Question 27

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

Options:

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Question 28

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 29

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 30

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set product readiness to manual,

B.

Copy link and products.

C.

Define business impact.

D.

Change product lifecycle state.

E.

Set product readiness to automatic.

Question 31

You need to meet the requirements for User2.

What should you configure?

Options:

A.

Process over/under transactions.

B.

Create a transfer journal.

C.

Cancel the product receipt.

D.

Correct the product receipt.

E.

Create a movement journal.

Question 32

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 33

You need to determine the batch values on the combined mix batches for OperatorA.

Which values should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 34

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 35

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 36

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 37

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set up configuration and weight for partial visibility.

B.

Create a product master with predefined variants for ounces and boxes.

C.

Set up configuration and weight for full visibility.

D.

Create a catch weight item.

Question 38

You need to resolve the issue for UserF.

What should you configure? To answer, select the appropriate options in the answer area.

as

NOTE: Each correct selection is worth one point.

Options:

Question 39

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Best before period in days

B.

Best advice period in days

C.

Backward tracing

D.

Forward tracing

E.

Shelf life period in days

Question 40

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 41

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

Question 42

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 43

You need to set up the correct production solution for the assembly area. Which solution should you implement?

Options:

A.

Standard warehousing with Manufacturing execution

B.

Standard warehousing for all transactions

C.

Advanced warehousing for all transactions

D.

Advanced warehousing with Manufacturing execution

Question 44

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 45

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Question 46

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Options:

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Question 47

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

as

Options:

Question 48

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

as

Options: