Summer Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: wrap60

NCARB PDD Dumps

Page: 1 / 10
Total 100 questions

ARE 5.0 Project Development and Documentation Exam Questions and Answers

Question 1

Temporary shoring of a masonry wall should remain in place until what point?

Options:

A.

Mortar joints are struck

B.

Lateral bracing connections are complete

C.

Horizontal reinforcing is installed

D.

Foundations are backfilled

Question 2

A wall separating a distillery and a taproom must meet which of the following requirements based on a flammable liquid presence?

Options:

A.

1-hour fire barrier

B.

2-hour fire wall

C.

1-hour smoke partition

D.

3-hour fire barrier

Question 3

as

Refer to the exhibit.

Which of the following examples of wood paneling depicts the method of "slip matching" between adjacent wood veneers?

Options:

A.

A

B.

B

C.

C

D.

D

Question 4

In addition to reducing heat conductance, the thermal break in the construction of metal window frames does which of the following?

Options:

A.

Increases air infiltration

B.

Increases sound transmission

C.

Reduces condensation

D.

Reduces the cost of manufacture

Question 5

Why is the vertical surface of a dry-stacked stone wall often battered into the retained material?

Options:

A.

Increased resistance to soil thrust

B.

Increased resistance to surface erosion of the wall

C.

Increased impermeability that reduces equivalent fluid pressure

D.

Increased cohesion between individual stones that make up the wall

Question 6

as

Refer to the exhibit.

For a plywood panel carrying the grade stamp shown, which of the following is the maximum recommended span for use in a floor system?

Options:

A.

15 in

B.

16 in

C.

32 in

D.

108 in

Question 7

A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.

Key project information includes:

    Brewing and distilling will operate year-round.

    Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.

    Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.

    Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.

    Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.

    The Market area will feature local farm products and is not conditioned.

    Entire building will be fully sprinklered.

    Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.

    Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.

    Public water and sewer is not available at the Project Site.

    Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

The following resources are available for your reference:

    Architectural Drawings, including plans, elevations, sections, and schedules

    Consultant Drawings, including structural, HVAC, power distribution, and plumbing

    PEMB Shop Drawings

    Design and Construction Schedule

    Specification Excerpts, showing relevant spec sections

    IBC and ADA Excerpts, showing relevant code and accessibility sections

    After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner decides to triple the size of the distillery component of the project to make hand sanitizer and wants to use the Tap Room spaces adjacent to the brewery and distillery for this purpose.

Which of the following must the architect reevaluate and change to accommodate this request? Check the three that apply.

Options:

A.

A-01 LIFE SAFETY PLAN

B.

A-02 SITE PLAN

C.

A-03 FLOOR PLAN

D.

A-04 REFLECTED CEILING PLAN

E.

A-05 ROOF PLAN

F.

A-06 EXTERIOR ELEVATIONS

Question 8

as

Refer to the exhibit.

An architect reviews the construction manager's construction estimate for a typical precast wall system with aluminum storefront windows.

Click on the component in the axonometric detail that is missing from the system estimate.

as

Options:

Question 9

An architect needs to reduce the budget by $150,000 for a proposed civic auditorium. Currently the project requires the following flooring materials:

    Stained concrete: 100,000 square feet

    Carpet: 50,000 square feet

    Ceramic tile: 20,000 square feet

    Vinyl composite tile (VCT): 25,000 square feet

The flooring material costs are as follows:

    Stained concrete: $6.00/sq ft

    Sealed concrete: $2.00/sq ft

    Carpet: $8.75/sq ft

    Ceramic tile: $15.00/sq ft

    VCT: $5.75/sq ft

    Vinyl plank flooring: $7.00/sq ft

Which of the following combinations of changes results in these savings?

Options:

A.

Change 15,000 sq ft of VCT to vinyl plank flooring and substitute 10,000 sq ft of VCT for carpet.

B.

Change 20,000 sq ft of stained concrete to VCT and substitute 30,000 sq ft of vinyl plank flooring for carpet.

C.

Change 20,000 sq ft of stained concrete to VCT and substitute 10,000 sq ft of VCT for ceramic tile.

D.

Change 25,000 sq ft of stained concrete to sealed concrete and substitute 30,000 sq ft of vinyl plank flooring for carpet.

Question 10

During plan review of an office building, the reviewer informs the architect of new regulations that require storage rooms greater than 150 sf be 1-hour fire rated. The proposed design has three 200 sf storage rooms that must meet the fire protection requirements. The architect needs to recommend how to meet this requirement with minimal effect on cost, time, and program.

Options:

A.

Construct storage rooms using rated concrete masonry.

B.

Construct storage rooms using metal studs and Type X gypsum board.

C.

Make four 150 sf storage rooms and redistribute throughout the building.

D.

Make six 100 sf storage rooms and redistribute throughout the building.

Question 11

A revolving door is to be mounted in the facade of a building. Story drift is limited to 0.002 times story height in any direction. The door can tolerate a maximum departure from vertical of 1/4 inch.

What is the maximum height the door can be to accommodate the story drift?

Options:

A.

8 ft

B.

9 ft

C.

10 ft

D.

11 ft

Question 12

Fire and smoke control requirements for air ducts include which of the following? Check the three that apply.

Options:

A.

Smoke damper

B.

Balancing damper

C.

Smoke barrier

D.

Fire damper

E.

Variable-volume smoke controls

F.

Air-handler shut-down sensors

Question 13

In coordination of construction documents, heating duct clearances and tolerances in suspended ceiling plenum spaces should be cross-checked with the mechanical engineer and which one of the following?

Options:

A.

HVAC contractor

B.

Electrical contractor

C.

Ceiling manufacturer

D.

Structural engineer

Question 14

as

Refer to the exhibit.

The construction method shown in the detail should be used to prevent cracking in which of the following situations?

Options:

A.

Structural steel frame buildings with plaster ceilings

B.

Concrete frame buildings with drywall suspended ceilings

C.

Concrete flat slab buildings with exposed slab ceilings

D.

Exposed structural steel frame with no partitions to the structure

Question 15

as

Refer to the exhibit.

For which of the following connections could diagonal bracing be eliminated?

Options:

A.

A

B.

B

C.

C

D.

D

Question 16

An architect is coordinating the mechanical and structural systems in a building with exposed ceilings. The HVAC ducts are interfering with a large concrete beam in the open office area.

Options:

A.

Relocate the beam to accommodate the ductwork

B.

Shift the HVAC ducts below the beam

C.

Request the mechanical engineer to reroute the ductwork

D.

Increase the ceiling height

Question 17

as

Refer to the exhibit.

Using metal stud framing, how many screws per stud are needed to connect the header if each screw is rated at 440 pounds for shear and 215 pounds for tension?

Options:

A.

2

B.

3

C.

4

D.

8

Question 18

The building permit plan review for a small, two-story residential project with a crawlspace issues the following comment to the architect:

"No under floor access shown in plans. Please locate and note locations of under floor access."

Site conditions will not allow access to the crawlspace from the exterior.

What drawing will the architect need to update to satisfy the reviewer's comment?

Options:

A.

Second Floor Framing Plan

B.

Main Floor Framing Plan

C.

Foundation Plan

Question 19

Which of the following documents defines the responsibilities and duties of the contractor during construction?

Options:

A.

A101

B.

A201

C.

B101

D.

G702

Question 20

Which of the following metals is best suited for embedments in concrete or masonry?

Options:

A.

Stainless steel

B.

Bronze

C.

Aluminum

D.

Cast iron

Question 21

Coordination of a motorized movable partition used to subdivide a gymnasium should include which of the following?

Options:

A.

Structural engineer and the electrical engineer

B.

Structural engineer and the mechanical engineer

C.

Fire protection engineer and the electrical engineer

D.

Fire protection engineer and the furniture and equipment consultant

Question 22

The single-line diagram for the electrical distribution system shown is for a multi-family project.

Click in the box on the single-line diagram where the transformer is located.

as

Options:

Question 23

as

Refer to the exhibit.

What is the primary function of the 2 x 4 blocking shown at X in the drawing?

Options:

A.

Transfer the lateral loads from the ceiling joists

B.

Support the top of the partition

C.

Brace the ceiling joists

D.

Transfer the lateral load to the 1 x 8

Question 24

A construction detail for a window sill shows metal flashing terminating behind the exterior cladding. Which principle is being demonstrated?

Options:

A.

Air barrier continuity

B.

Structural redundancy

C.

Thermal bridging

D.

Water management

Question 25

as

Refer to the exhibit.

What set of conductors should the building fluorescent Lighting be connected to?

Options:

A.

A, B

B.

C, A, B

C.

C,N

D.

C,A,N

Question 26

During drawing review, a discrepancy is found between the drawings and room 101 on the finish schedule.

Click in the cell on the room finish schedule that does not match the drawings.

as

Options:

Question 27

During the documentation of an office building, the owner requests a fitness center amenity be added to the scope. The mechanical engineer informs the architect that the mechanical unit currently located on a utility mezzanine will need to increase in size to accommodate the required increased capacity.

Who should the architect confirm with that the larger unit will work in this location?

Options:

A.

Building owner

B.

Authority having jurisdiction

C.

Accessibility consultant

D.

Structural engineer

Question 28

In winter conditions, when the outdoor air is below freezing and the indoor humidity is maintained at 40 percent relative humidity for 24 hours a day, ice forms on the exterior surface of the stone facing.

Which of the following elements is missing from the building wall section?

Options:

A.

Vapor barrier

B.

Wall insulation

C.

Air space

D.

Rain screen

Question 29

During CD phase, the architect notices plumbing lines clash with roof trusses. What should the architect do first?

Options:

A.

Revise the truss design

B.

Notify the contractor

C.

Consult with the plumbing engineer

D.

Add soffits to conceal pipes

Question 30

as

Refer to the exhibit.

The exterior cast-in-place concrete wall of a heated building is insulated with polyurethane slabs.

The concrete will be warmest in the winter if the insulation is applied as shown in which of the following?

Options:

A.

A

B.

B

C.

C

D.

D

Page: 1 / 10
Total 100 questions