Spring Sale Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

Pure Storage FlashArray-Implementation-Specialist Dumps

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 1

An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?

Options:

A.

purehost monitor --balance

B.

purehost list --all

C.

pureport list --initiator

Question 2

Which command should an Implementation Engineer use to allow Support access to an array?

Options:

A.

purearray connect --remoteassist

B.

purearray remoteassist

C.

purearray remoteassist --connect

Question 3

Which cards are required to connect a DirectFlash Shelf to an FlashArray//XLR5?

Options:

A.

2-Port 100GbE iSCSI/RoCE

B.

2-Port 50GbE

C.

2-port 200GbE Ethernet/RoCE

Question 4

A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?

Options:

A.

2

B.

3

C.

4

Question 5

An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

Options:

A.

puremessage list --open --hidden

B.

purearray diagnose --log

C.

purealert watcher list

Question 6

FlashArray//C and //E models use which flash storage architecture, identifiable by gray tabs on the DirectFlash Module carriers?

Options:

A.

SLC Flash

B.

QLC flash

C.

TLC Flash

Question 7

What are the default replication ports on all three rack unit FlashArray models?

Options:

A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

Question 8

The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?

Options:

A.

Credentials and port number

B.

Protocol prefix and credentials

C.

Protocol prefix and port number

Question 9

An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf.

What will be the resulting pair of interfaces?

Options:

A.

ETH6 and ETH7

B.

ETH5 and ETH6

C.

ETH4 and ETH5

D.

ETH8 and ETH9

Question 10

An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?

Options:

A.

Install a DFS card in PCIe Slot 0 and use these ports for Shelf connectivity.

B.

Install a DFS card in PCIe slot 4 and use it to connect the second DirectFlash Shelf.

C.

Install a DFS card in PCIe slot 3 and use it to connect the second DirectFlash Shelf.

Question 11

What is the minimum number of physical Ethernet ports per controller that should be dedicated to the file-services interface to ensure redundancy?

Options:

A.

0

B.

2

C.

4

D.

6

Question 12

An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.

How should the Implementation Engineer complete the installation?

Options:

A.

Install a DFS card in PCIe slot 3 and use it to connect the second DirectFlash Shelf.

B.

Install a DFS card in PCIe slot 4 and use it to connect the second DirectFlash Shelf.

C.

Install a DFS card in PCIe slot 0 and use these ports for shelf connectivity.

D.

Daisy-chain the second shelf directly into the SAS ports of the first DirectFlash Shelf.

Question 13

What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?

Options:

A.

FC0, FC1, FC2, and FC3

B.

FC4, FC5, FC6, and FC7

C.

FC5, FC6, FC7, and FC8

Question 14

At the completion of an upgrade, which command is used to send phonehome logs?

Options:

A.

purelogs --send-all

B.

purearray phonehome --send-logs

C.

purearray phonehome --send-today

Question 15

An Implementation Engineer needs to upgrade Purity to version 6.9.2 on a FlashArray. The .ppkg file was too large to fit on a USB stick as a single file and has been copied to the array as two split files.

How should the Implementation Engineer join the files into a single file to be installed?

Options:

A.

join /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkga* -o /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkg

B.

cat /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkga* > /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkg

C.

tar -xf /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkga* /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkg

D.

zip -m /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkg /home/puresetup/purity_6.9.2_202510142333+afllcdel386b.ppkga*

Question 16

What is the rack unit height of a FlashArray//XL?

Options:

A.

4

B.

5

C.

6

Question 17

Before installing array rails, where should the cage nuts be placed?

Options:

A.

Lowest square of lowest RU

B.

Lowest square of top RU

C.

Top square of the lowest RU

Question 18

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.

What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?

Options:

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

D.

Front panel: 216 mm (8.5 in.), Rear panel: 216 mm (8.5 in.)

Question 19

An evacuation is already in progress when the Account Team informs the Implementation Engineer that the customer wants to include another data pack to the evacuation. How should the Implementation Engineer proceed with this request?

Options:

A.

Issue a new evacuation command and the FlashArray will add it to the current evacuation job.

B.

Cancel the current evacuation and start a new evacuation with the additional packs or shelves included.

C.

Wait for the current evacuation to complete before starting a new one.

D.

Pause the current evacuation, add the pack, and resume the process.

Question 20

When accessing the FlashArray GUI, which management IP address is recommended for use?

Options:

A.

CT1 management IP

B.

CT0 management IP

C.

Virtual management IP

Question 21

An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray. After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?

Options:

A.

find_drive.py

B.

puredb list drives

C.

puredrive list --pack CH0.BAY10

Question 22

A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?

Options:

A.

Use the evac_checks script.

B.

Ensure that usable capacity is less than 80%.

C.

Ensure that usable capacity is less than 90%.

Question 23

During a HWNDU, the Implementation Engineer initializes CT0 and runs health checks. They observe 12 fewer iSCSI connections compared to pre-upgrade results. While reviewing port speed and status, the output shows CT0.ETH14 at 0.00 b/s. What is the first action the Implementation Engineer should take to troubleshoot?

Options:

A.

Swap the SFP from CT0.ETH14 to the unused management port in CT0.ETH5 and re-check port speed.

B.

Ask the customer to verify which hosts have missing paths and have them reboot the affected hosts.

C.

Ensure the SFP in CT0.ETH14 is fully-seated on the array and re-seat if necessary.

Question 24

What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?

Options:

A.

0

B.

1

C.

2

Question 25

An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?

Options:

A.

Evac the chasses drives, install the new 91TB chassis data pack, and evac SH0.

B.

Move the 20TB chassis DP to SH0, install the new 91TB chassis DP, evac the 10TB chassis DP, and evac SH0.

C.

Evac SH0, evac the 20TB chassis DP, install the new 91TB DP, and evac the 10TB chassis DP.

Question 26

After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to Pure services?

Options:

A.

purearray list --connect

B.

purearray test

C.

puresupport test

D.

purenetwork test

Question 27

After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?

Options:

A.

Storage > Replication

B.

Storage > Array Connections

C.

Settings > Network

D.

System > Configuration

Question 28

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

puresetup proxy https://yourproxyserver:1234

B.

purearray setattr --proxy https://yourproxyserver:1234

C.

purearray configure --proxy url https://example.proxy.server

Question 29

How many power connections are required for the FlashArray//XL chassis?

Options:

A.

2

B.

4

C.

6

D.

8

Question 30

Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?

Options:

A.

pureboot list

B.

cobalt check . py

C.

purehw list

Question 31

Which power cable receptacle type does the FlashArray//X accessory kit contain?

Options:

A.

C19 to C20

B.

C14 to C15

C.

C13 to C14

Question 32

Which command should the Implementation Engineer use to easily verify connectivity to Pure1 from a FlashArray?

Options:

A.

purearray test pinghome

B.

puresupport phonehome

C.

purearray phonehome test

Question 33

By default, which network interface does FA File use to resolve and reach domain controllers?

Options:

A.

replication

B.

management

C.

filevip

D.

vif

Question 34

Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?

Options:

A.

8-N-1, Xon/Xoff flow control, 115,200 baud

B.

8-E-1, Xon/Xoff flow control, 115,200 baud

C.

8-N-1, Xon/Xoff flow control, 38,400 baud

Question 35

Which ports are used by default for replication on a FlashArray//XR4?

Options:

A.

ETH 2 and ETH 3

B.

ETH 3 and ETH 4

C.

ETH 0 and ETH 1

D.

ETH 4 and ETH 5

Question 36

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

purearray setattr --proxy https://yourproxyserver:1234

B.

puresetup proxy https://yourproxyserver:1234

C.

purearray configure --proxy url https://example.proxy.server

D.

purenetwork proxy set https://yourproxyserver:1234

Question 37

Which default speed FC SFPs are shipped in FlashArray//XCR4 FC arrays?

Options:

A.

16

B.

32

C.

64

Question 38

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3

B.

4

C.

5

Question 39

A customer would like to reduce SafeMode settings for retention and eradication with their current policy. How is authorization obtained to make the requested changes?

Options:

A.

A Pure1 Admin needs to approve any changes for Pure Support to proceed.

B.

Two SafeMode approvers need to acknowledge via Pure1 step-up authentication before any changes can be made.

C.

The local account on FlashArray needs to permit any local changes.

Question 40

Which PCIe slot must be used for a SAS HBA on R4B revision controllers?

Options:

A.

PCIe slot 1

B.

PCIe slot 0

C.

PCIe slot 4

D.

PCIe slot 2

Question 41

What are the default replication ports on all three rack unit (3U) FlashArray models?

Options:

A.

ETH0 and ETH1

B.

ETH2 and ETH3

C.

ETH4 and ETH5

D.

ETH6 and ETH7

Question 42

When performing an install on a FlashArray, what step should be taken first?

Options:

A.

CT0 configuration

B.

CT1 configuration

C.

Code upgrade

Question 43

Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?

Options:

A.

DMMs are only compatible with //XL 170.

B.

DMMs cannot be installed in a DirectFlash Shelf (DFS).

C.

DMMs use different drive slots to regular DirectFlash modules.

Question 44

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

Options:

A.

Starting in bay 19, right to left.

B.

Starting in bay 0, left to right.

C.

Starting in bay 10, left to right.

Question 45

On a FlashArray//X50 R2/R3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

Options:

A.

2-port in slot 0

B.

2-port in slot 2

C.

4-port in slot 0

Question 46

An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?

Options:

A.

purehost list --all

B.

pureport list --initiator

C.

purehost monitor --balance

Question 47

What command can be used to identify interface status?

Options:

A.

purenetwork list

B.

purenetwork list --all

C.

purenetwork list --eth

Question 48

An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU. At what step should the Implementation Engineer contact support for assistance?

Options:

A.

After removing the fully evacuated drives before proceeding with the hardware NDU

B.

After removing the Old drives and inserting any new ones

C.

When the hardware NDU has been completed

Question 49

In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?

Options:

A.

M > XR2

B.

M > XR2/3

C.

XR2 > XR3

Question 50

During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?

Options:

A.

After booting the FlashArray//XL into shelf mode

B.

As part of initial install before power-on

C.

Immediately following the purity software upgrade

Question 51

For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity. How Will this affect the installation process?

Options:

A.

The array's data will be inaccessible.

B.

Management connectivity is required for installation.

C.

The customer Will be unable to login to the array.

Question 52

During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?

Options:

A.

FlashArray names cannot include hyphens.

B.

FlashArray names cannot include numbers.

C.

FlashArray names cannot contain spaces.

Question 53

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

Options:

A.

Starting in bay 10, left to right.

B.

Starting in bay 0, left to right.

C.

Starting in bay 19, right to left.

D.

Starting in bay 4, left to right.

Question 54

An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves. What is the minimum rack space required for this installation?

Options:

A.

9U

B.

11U

C.

12U

Question 55

At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?

Options:

A.

purearray phonehome --send-logs

B.

purelogs --send-all

C.

purearray phonehome --send-today

Question 56

Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?

Options:

A.

pureuser

B.

puresetup

C.

pureinstall

Question 57

An Implementation Engineer is onsite to install a new DirectFlash Shelf on a FlashArray//XL that does NOT have any installed. There is an I/O card installed and in use on the default slot for the first shelf.

Where should the Implementation Engineer install the PCIe card for connectivity?

Options:

A.

PCIe Slot 8

B.

PCIe Slot 6

C.

PCIe Slot 5

D.

PCIe Slot 2

Question 58

An evacuation is already in progress when the Account Team informs the Implementation Engineer that the customer wants to include another data pack to the evacuation. How should the Implementation Engineer proceed With this request?

Options:

A.

Wait for the current evacuation to complete before starting a new one.

B.

Issue a new evacuation command and the FlashArray will add it to the current evacuation job.

C.

Cancel the current evacuation and start a new evacuation with the additional packs or shelves included.

Question 59

On a FlashArray running Purity 6.9.2+, what is the recommended way to initiate a planned controller failover during a FlashArray//XR5 HWNDU?

Options:

A.

purewes controller setattr --verify-array < host-name > ct0 --mode secondary

B.

puredb giveback --safe

C.

purendu procedure start giveback

D.

purehw controller failover

Question 60

On FlashArray//XL, which slots support a 4-port FC card?

Options:

A.

1, 3, and 8

B.

1, 5, and 8

C.

1, 2, and 8

D.

2, 4, and 6

Question 61

Refer to the following output:

Ping successful with CCM

What does this indicate?

Options:

A.

Controller has successfully connected to pure1

B.

Controller has successfully connected to the Fusion Fleet Coordinator

C.

Cross-controller link has successfully connected between controllers

Question 62

By default, which network interface does FA File use to resolve and reach domain controllers?

Options:

A.

replication

B.

filevip vif

C.

management

Question 63

A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

Options:

A.

Purity must be upgraded to 6.x

B.

The array chassis must be fully populated with modules.

C.

The array usage percentage must be lower than 60%

Question 64

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis. What type of controller is required to complete the upgrade?

Options:

A.

FLASHARRAY//XC50 R4, SE

B.

FLASHARRAY//XC50 R4, NS

C.

FLASHARRAY//XC50 R4

Question 65

When accessing the FlashArray GUI, which management IP address is recommended for use?

Options:

A.

CT1 management IP

B.

CT0 management IP

C.

Virtual management IP

D.

Replication management IP

Question 66

An Implementation Engineer performing an inventory of hardware for an NDU from an FlashArray//X70R2 to an FlashArray //X90R3 and discovers a complete FlashArray//X90R3 was shipped in place of an NDU kit. What is the minimum hardware the Implementation Engineer should use from this array to complete the NDU?

Options:

A.

Controllers

B.

Controller and power supplies

C.

Controller and NVRAM

Question 67

At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?

Options:

A.

purearray phonehome --send-logs

B.

purelogs --send-all

C.

purearray phonehome --send-today

D.

purearray send --phonehome

Question 68

When using FA File, where can the Implementation Engineer manage directories?

Options:

A.

Storage > File Systems

B.

Settings > Access > Directory Services

C.

Analytics > Performance > Directories

Question 69

An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?

Options:

A.

purewes controller disable --purity --verify-mode secondary --verify-array ARRAY_NAME ct0

B.

purewes controller disable --purity --verify-mode primary --verify-array ARRAY_NAME ct0

C.

purewes controller setattr --disable --verify-mode secondary --verify-array ARRAY_NAME ct0

Question 70

Once the new Purity firmware has been installed using the pureinstall command, what step is required to commit the new version?

Options:

A.

Log out of the controller

B.

Reboot the controller

C.

Reboot the array

Page: 1 / 23
Total 234 questions