Labour Day Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dumps65

SAP C_TS411_2021 Dumps

SAP Certified Application Associate - SAP S/4HANA R&D Engineering Questions and Answers

Question 1

Which features are available when working with the Manage Documents app?Note: There are 2 correct Answers to this question.

Options:

A.

A secure storage area can be selected manually.

B.

An object link to every SAP Object can be defined.

C.

All information is displayed on only one page.

D.

A secure storage area is selected automatically.

Question 2

Which prerequisites must be fulfilled before a configuration profile can be created and released for a configurable material?

Options:

A.

At least one variant class must be assigned to the configurable material. Values must be assigned to the characteristics here.

B.

At least one variant class must be assigned to the configurable material.

C.

At least one variant class must be assigned to the configurable material. Values must not be assigned to the characteristics here.

D.

Exactly one variant class must be assigned to the configurable material.

Question 3

You are working with VC Modeling Environment PMEVC. Complete object dependencies are created by drag & drop of one or more characteristic values into a BOM item.What can be created with this drag & drop functionality?Note: There are 2 correct Answers to this question.

Options:

A.

Selection conditions and procedures

B.

Local and global object dependencies

C.

Selection conditions only

D.

Local object dependencies only

Question 4

What happens to the group BOM when you do a plant assignment?

Options:

A.

The internal number and the BOM usage becomes new.

B.

The internal number stays unchanged and the BOM usage becomes new.

C.

The internal number becomes new and the BOM usage stays unchanged.

D.

The internal number and the BOM usage stays unchanged.

Question 5

For which applications can you define formulas inside a Work Center?Note: There are 3 correct Answers to this question.

Options:

A.

Capacities

B.

HR assignment

C.

Scheduling

D.

Hierarchy

E.

Costing

Question 6

You can assign material components to operations.What needs to be taken into account?

Options:

A.

You can only assign material components that have also been assigned to the routing as production resources and tools.

B.

You can only assign material components that were previously assigned to the header material.

C.

You can only assign material components that are components of a material BOM.

D.

You can only assign each material component, when the material master exists and is known in the plant.

Question 7

What controls the material BOM item category?Note: There are 2 correct Answers to this question.

Options:

A.

A work center is required.

B.

A change number is required.

C.

A material number is required.

D.

A negative quantity is allowed.

Question 8

What information does a change number header include?Note: There are 2 correct Answers to this question.

Options:

A.

Object information

B.

Change number status

C.

Parameter effectivities

D.

Change type

Question 9

For which objects can you define a status network?Note: There are 2 correct Answers to this question.

Options:

A.

Change number record

B.

Change record

C.

Document info record

D.

Material master record

Question 10

How can you restrict the search result?Note: There are 2 correct Answers to this question.

Options:

A.

Filters

B.

Change number

C.

Validity

D.

Reselect

Question 11

What should be taken into account for names of characteristics?Note: There are 3 correct Answers to this question.

Options:

A.

The name is purely numeric and must be assigned internally.

B.

The following are allowed: Letters, figures, underscore, and hyphen.

C.

If the name contains a hyphen, a keyword SKEY is required in the syntax of object dependencies.

D.

The name must start with a letter and must be assigned externally.

E.

You can change the name at any time later.

Question 12

What do you have to keep in mind when overwriting characteristic for a specific class?

Options:

A.

This change applies only to the characteristic, when it is used in this class.

B.

The status of this characteristic is automatically set to locked.

C.

This change applies only to the characteristic, when it is used in every class.

D.

The status of this characteristic is automatically set to incomplete.

Page: 1 / 8
Total 80 questions