Pre-Winter Sale Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

SAP E_S4HCON2023 Dumps

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

Options:

A.

750

B.

700

C.

731

D.

740

Question 2

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Question 3

Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

Options:

A.

Target DB size will increase temporarily

B.

A

C.

DMO can only be run with systems NW740 or NW731

Question 4

In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?

There are 2 correct answers to this question.

Options:

A.

During downtime

B.

During SPDD

C.

Post-downtime

D.

During uptime

Question 5

You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

Options:

A.

As part of the cleanup process

B.

Before the downtime starts

C.

Early in the downtime

D.

At the end

Question 6

You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

Options:

A.

The source system is non-Unicode and the target database is a scale-out system.

B.

The target database size increases temporarily because of the Shadow Repository.

C.

SAP HANA Landscape Reorganization required a manual step to edit a file.

D.

Network capacity between exporting and importing R3load processes must be.

E.

Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Question 7

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

Options:

A.

Downtime Optimized DMO (DoDMO)

B.

Near-Zero Downtime Maintenance (nZDM)

C.

Near-Zero Downtime Technology (NZDT)

D.

Downtime Optimized Data Conversion (DoC)

Question 8

What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

Options:

A.

It explains the database migration option (DMO) of SUM.

B.

It contains a section about the simplification item (SI) checks.

C.

It explains where to find information about the custom code analysis.

D.

It is a database-specific document.

Question 9

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

Options:

A.

To optimize the migration

B.

To optimize the activation

C.

To optimize the conversion

D.

To optimize the main import

Question 10

During a DMO procedure with SUM, after which phase is the repository first available on the target database?

Please choose the correct answer.

Response:

Options:

A.

Uptime migration (EU_CLONE_MIG_UT_RUN)

B.

ParaUel distribution (PARDIST_SHD)

C.

Downtime migration (EU_CLONE_MIG_DT_RUN)

D.

Shadow repository creation (EU_IMPORT*)

Question 11

During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?

There are 2 correct answers to this question.

Response:

Options:

A.

Check for running batch jobs in the shadow system via Job Overview (SM37)

B.

Check for running R3trans processes on the host of the primary application server

C.

Check for running R31oad processes on the host of the primary application server

D.

Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Question 12

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

Options:

A.

Software update

B.

Conversion

C.

Main import

D.

Migration

Question 13

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.

Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Options:

A.

These are 40 pairs of Reload processes, so there are 80 R3load processes running.

B.

SUM is still running in uptime; the 40 defined Reload processes are considered.

C.

Without table contents comparison, only 40 R3load processes are being started.

D.

There are 40 Reload processes used for copying and 40 Reload processes for table count verification.

Question 14

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Shadow on target creation

B.

Downtime conversion

C.

Silent data migration (SDM)

D.

Downtime migration

Question 15

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

Options:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Question 16

The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?

There are 2 correct answers to this question.

Response:

Options:

A.

Check the most recent entries shown in file sapevt.trc

B.

Check the system log (transaction SM21) of the SAP system

C.

Check the messages shown by the SUM UI

D.

Check the most recent entries in SAPup.log

Question 17

You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

Options:

A.

The upgrade of the PRD must be finished before you start new development in the DEV.

B.

The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

C.

The transport between Unicode and non-Unicode systems is forbidden.

D.

The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Question 18

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Question 19

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

Options:

A.

Phases DIFF*

B.

Phase DOWNCONF_DTTRANS

C.

Phase RUN_RSPTBFIL _ISUTABU

D.

Phases EU_IMPORT*

E.

Phase RUN_RSDBSCPY

Question 20

What do you need to know about the SAP ERP Upgrade and Update Guide?

There are 2 correct answers to this question.

Response:

Options:

A.

It contains a troubleshooting section

B.

It is target release specific

C.

It contains a section "free space requirements"

D.

It is a database-specific document

Question 21

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

Options:

A.

Run the database migration to the SAP HANA database

B.

Perform the migration of data into the new data structure

C.

Check the compatibility of custom code with SAP S/4HANA

D.

Apply the recommendations of the simplification list

Question 22

During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?

Please choose the correct answer.

Response:

Options:

A.

It performs a comparison on selected tables using check sum.

B.

It performs a comparison on all tables using row counts.

C.

It performs a comparison of all tables using check sum.

D.

It does NOT perform any table comparison.

Question 23

Which circumstances will allow SUM to run without the creation of a shadow system?

Please choose the correct answer.

Response:

Options:

A.

Using the main configuration option "Single System" when installing an Add-On

B.

Using the main configuration option "Single System" in case of an upgrade.

C.

Using the database migration option (DMO) for SUM

D.

Using the main configuration option "Standard" when applying SAP Support Packages

Question 24

You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?

Please choose the correct answer.

Response:

Options:

A.

/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

B.

/ASU/SSM (ASU Simple Schedule Manager)

C.

/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

D.

/ASU/START (Start ASU Toolbox)

Page: 1 / 8
Total 80 questions